상세 보기
우리나라 실측 주파수특성을 통한 발전기의 일차 주파수응답 예비력 요구량 산정 연구
- 박민수;
- 김우중;
- 전영환
초록
When a generator trips, the frequency of the system begins to drop but the control action of governors of the generators stops the drop of the frequency and restore it to a quasi steady state. At the quasi steady state, the output of each generator is determined by the generator constant and the damping constant of the system load. But, in many cases, the measured value of frequency trajectories and the generator outputs differ from the theoretical values. The difference is considered due to the complex properties and the non-linearity of the generator models. In this paper, we suggest a calculation method of generator constants and load constants and primary reserve requirements by using real power system frequency trajectory and data sets in the past generator trip situation. The data set includes system frequencies, system loads, and active power losses due to the trip of generators.
키워드
- 제목
- 우리나라 실측 주파수특성을 통한 발전기의 일차 주파수응답 예비력 요구량 산정 연구
- 제목 (타언어)
- Calculation of Primary Reserve Requirements based on Measurements of Frequency Trajectories of Korean Power System
- 저자
- 박민수; 김우중; 전영환
- 발행일
- 2019
- 저널명
- 전기학회논문지
- 권
- 68
- 호
- 3
- 페이지
- 399 ~ 404
- 언어
- KOR
- 출판사
- 대한전기학회
- 발행국가
- 대한민국
- 분량
- 6 페이지
- ISSN
- E 2287-4364
P 1975-8359