Parallel Machine Scheduling Considering the Moving Time of Multiple Servers

Parallel Machine Scheduling Considering the Moving Time of Multiple Servers
  • 정균락

초록

In this paper, we study the problem of parallel machine scheduling considering the moving time of multiple servers. The parallel machine scheduling is to assign jobs to parallel machines so that the total completion time(makespan) is minimized. Each job has a setup phase, a processing phase and a removal phase. A processing phase is performed by a parallel machine alone while a setup phase and a removal phase are performed by both a server and a parallel machine simultaneously. A server is needed to move to a parallel machine for a setup phase and a removal phase. But previous researches have been done under the assumption that the server moving time is zero. In this study we have proposed an efficient algorithm for the problem of parallel machine scheduling considering multiple server moving time. We also have investigated experimentally how the number of servers and the server moving time affect the total completion time.

키워드

parallel machine schedulingtotal completion timemultiple serverserver moving time
제목
Parallel Machine Scheduling Considering the Moving Time of Multiple Servers
제목 (타언어)
Parallel Machine Scheduling Considering the Moving Time of Multiple Servers
저자
정균락
DOI
10.9708/jksci.2017.22.10.101
발행일
2017
저널명
한국컴퓨터정보학회논문지
22
10
페이지
101 ~ 107