On UFR settings considering wind power fluctuation in Jeju Island

Citations

SCOPUS

0

초록

Jeju power system is connected to the mainland power system through HVDC, and receives about half of required electricity through the HVDC lines. Jeju power system already experienced black out when a generator tripped at the moment of the HVDC line faults. But, UFR operated as was expected when HVDC line fault occurred at that time. As the penetration level of wind turbines increases, it is required to set UFR again considering intermittent wind turbin outputs. In this paper, we address a new way of UFR setting through computer simulation.

키워드

HVDC; Jeju; Load shedding; UFR; Wind power; Computer simulation; HVDC; Jeju; Jeju island; Jeju power system; Load-shedding; Penetration level; Power fluctuations; UFR; Wind power
제목
On UFR settings considering wind power fluctuation in Jeju Island
저자
Park, M.-S.; Chun, Y.-H.; Byun, S.-H.; Yang, J.-J.
DOI
10.5370/KIEE.2014.63.4.445
발행일
2014
유형
Article
저널명
전기학회논문지
권
63
호
4
페이지
445 ~ 450