상세 보기
On UFR settings considering wind power fluctuation in Jeju Island
- Park, M.-S.;
- Chun, Y.-H.;
- Byun, S.-H.;
- Yang, J.-J.
Citations
SCOPUS
0초록
Jeju power system is connected to the mainland power system through HVDC, and receives about half of required electricity through the HVDC lines. Jeju power system already experienced black out when a generator tripped at the moment of the HVDC line faults. But, UFR operated as was expected when HVDC line fault occurred at that time. As the penetration level of wind turbines increases, it is required to set UFR again considering intermittent wind turbin outputs. In this paper, we address a new way of UFR setting through computer simulation.
키워드
HVDC; Jeju; Load shedding; UFR; Wind power; Computer simulation; HVDC; Jeju; Jeju island; Jeju power system; Load-shedding; Penetration level; Power fluctuations; UFR; Wind power
- 제목
- On UFR settings considering wind power fluctuation in Jeju Island
- 저자
- Park, M.-S.; Chun, Y.-H.; Byun, S.-H.; Yang, J.-J.
- 발행일
- 2014
- 유형
- Article
- 저널명
- 전기학회논문지
- 권
- 63
- 호
- 4
- 페이지
- 445 ~ 450
- 언어
- KOR
- 출판사
- Korean Institute of Electrical Engineers
- 발행국가
- 대한민국
- 분량
- 6 페이지
- ISSN
- E 2287-4364
P 1975-8359